1. Package: Machine devices will be Naked for Metal coil cut to length line machine and all the roller parts will be antirust treatment to protect the rollers. All the spare parts will be collected into the homemade steel boxes 2. Delivery: 80 days 3. Container: 1x40OT and 1x40GP 4. Shipping: All the parts in the containers will be strengthened with the container to prevent