Machinery and iron casting double girder crane lifting for metallurgy workshop Package: 1. Electrical parts are packed by strong plywood box, to prevent the rain soaked. 2. Main portal frame, beams and others are packed in plastic woven cloth, to prevent corrosion in seawater.